Parks · San Antonio · Northeast & Windcrest
San Antonio lands $9.1 million TxDOT grant for the Beitel Creek Greenway trail
The new segment of the Howard W. Peak Greenway will run from Wurzbach Parkway to Weidner Road and include a 1,300-foot bridge over a rail line.
BOLO Newsroom ·

- San Antonio Parks and Recreation won a competitive TxDOT grant of more than $9 million.
- The Beitel Creek trail adds about 0.67 miles of 10-foot concrete trail and a 29-space trailhead lot.
- Construction is expected to start in summer 2027 and finish by fall 2028.
SAN ANTONIO, Texas (Nov. 17, 2026) The city's Parks and Recreation Department has won a $9.1 million competitive grant from the Texas Department of Transportation's Texas Transportation Commission, the city announced Nov. 16. The department called it one of the largest grants it has received.
The money will help build the Beitel Creek Greenway, a new segment of the Howard W. Peak Greenway Trail System that runs from the Wurzbach Parkway Trailhead to Weidner Road, according to the city. The project includes a 1,300-foot pedestrian bridge over a Union Pacific Railroad line, about 0.67 miles of 10-foot-wide concrete trail, a 29-space parking lot and a trailhead off Leonhardt and Weidner roads.
Trailhead features will include a shade structure, drinking fountain, restroom enclosure, tree plantings, irrigation and an emergency call box. The city says the trail also links to the Great Springs Project's Texas Bicentennial Trail between San Antonio and Austin. Construction is expected to start in summer 2027 and be done by fall 2028.
Parks Director Homer Garcia III said the grant helps stretch money from the voter-approved bond.